This is in the logbook but it is worth reiterating.  Since the start 
counter has been moved to the right side of Blast, there is less slack in 
its borrowed fiber optic cable.  Plese verify that this cable is 
disconnected prior to separating the subframes if it looks as if it won't 
reach.
                                Pete
This archive was generated by hypermail 2.1.2 : Mon Feb 24 2014 - 14:07:28 EST