Operators: shino   yxiao   ----
Continue pol. hydrogen data taking, from run 2427 to 2434 , in whicgh run 2428 and 2429 are junk, with target holding field = longitudinal,  500 A, 180deg.  All data have been crunched.
WC L21 HV couldn't stay at 3800V, so lowered to 3750V from run 2431. 
HV GUI hanged once -- "stuck" at transition state. Rebooting  HV IOC  solved the problem. 
Compton hanged several times; need to reboot the IOC and restart the daq script.
This archive was generated by hypermail 2.1.2 : Mon Feb 24 2014 - 14:07:29 EST