Running now on polarized deuterium.  CCR needed to adjust vertical 
steering in target region slightly (due to coil bolt 
tightening?).  Deadtime is 15-20%, so we will go to 150mA fill tomorrow 
morning.   There is a concern of increasing the dumped beam current 
(problems with the flip targets we dump on) -- may install a different beam 
dump during shutdown.
        BLAST power supply still trips at about 6600A when ramping.  More 
investigations with Bruker to come.
        Tomorrow Bill will check the Compton detector and laser tomorrow, and then 
operations will take the beam Friday during the day to optimize the 
Compton/experiment beam tune.
        Plan is to run polarized deuterium until Monday, then switch to empty target.
                                        Karen
*************************************
We still need volunteers for the evening shifts on Saturday and 
Sunday!!!!!!!!!!!!!!!!!!!!
*************************************
This archive was generated by hypermail 2.1.2 : Mon Feb 24 2014 - 14:07:31 EST